← Job cost subsystem for an entity (internal)
The three internal control documents
Each one authorises and records a different input, before it reaches the job cost card.What each document controls
- MATERIALS REQUISITION: authorises materials to leave the store, recording the job number, item and quantity.
- TIME SHEET: records which job an employee worked on and for how long, signed off by a supervisor.
- JOB COST CARD: accumulates materials, labour and applied overhead as the job progresses, checked against the quote in real time.